Well-Drilling and Groundwater Monitoring Network Construction Taking Changde City as an Example
Download PDF

Keywords

Groundwater
Well-drilling
Monitoring network
Changde City

DOI

10.26689/jwa.v7i4.5017

Submitted : 2023-07-30
Accepted : 2023-08-14
Published : 2023-08-29

Abstract

Entrusted by the Environmental Protection Bureau of Changde City we conducted drilling sampling survey and constructed a monitoring network for groundwater in several counties and districts of Changde City. This article introduces the drilling technology detection method and detection network layout plan adopted in the project and expounds the problems that occurred while executing the project in order to provide reference for similar groundwater capacity supervision and construction projects.

References

Sun W, Wang H, 2019, Research on Problems and Countermeasures in the Construction of Groundwater Monitoring Information System. Groundwater, 2019(5): 35–37.

Yang L, Liang C, Li H, 2019, The Current Situation and Thinking of the Construction of Groundwater Monitoring Station Network in Guangxi. Water Resources Development and Management, 2019(6): 31–35.

Li Q, Zhang P, 2019, Analysis on the Current Situation of Groundwater Resources in Shaanxi Province and Countermeasures for Protection and Management. Groundwater, 2019(5): 42–44.

Hu Y, 2016, Thoughts on the Construction of Three-Level Groundwater Monitoring Station Network in Shandong Province. Shandong Land and Resources, 32 (12): 62–64.

Yang P, Li Y, Wu G, 2019, Analysis and Prospect of Groundwater Monitoring Status in Shandong Province. Shandong Land and Resources, 35(1): 78–83.

Yang R, Zheng C, Xia Y, 2020, Hunan: Analysis of the Status Quo of Groundwater Monitoring and Countermeasures. Regional Governance, 2020(5): 24–26.

Yang Q, 2019, Influencing Factors and Control Measures of Environmental Monitoring Site Sampling Quality. Environment and Development, 31(10): 133–134.

Ding Z, 2020, Application of R Software in Groundwater Environmental Quality Assessment. Environmental Protection and Circular Economy, 40(11): 4.

Dong Z, Huang Y, 2002, A Review of Groundwater Dynamic Prediction Models. Western Exploration Engineering, 14 (4): 36–39.

Liu J, Yang Z, Liu N, 2020, Reflections on the Capacity Building of Groundwater Environment Monitoring During the “14th Five-Year Plan” Period. Environment and Development, 32(5): 157–159.