This paper discusses the significance of the collaborative development of construction project management and construction technology. It analyzes issues in their cooperation, especially in waste-to-energy projects, which face technical complexity and management challenges. It also explores technology-driven efficiency opportunities, process re-engineering, and various decision-making models. Case studies illustrate their application, and synergy efficiency indicators and lifecycle impact assessment are used for evaluation. Finally, it proposes implementation roadmaps and intelligent collaboration platforms for future research.
Chen Y, Wang J, Li H, 2021, Integration of BIM and ERP in Construction Project Management: A Case Study of Waste-to-Energy Plants. Automation in Construction, 2021(132): 103934.
Zhang L, Liu W, Wang Y, 2022, Technical Challenges and Management Strategies in Waste-to-Energy Facility Construction. Renewable and Sustainable Energy Reviews, 2022(168): 112865.
Li X, Zhang Q, Chen Z, 2023, Collaborative Decision-Making Model for Construction Technology Integration. Advanced Engineering Informatics, 2023(56): 101987.
Wang H, Sun T, Xu M, 2021, Process Re-Engineering in Environmental Project Management: Lessons from Energy Conversion Projects. Journal of Cleaner Production, 2021(317): 128391.
Garcia A, Kim D, Park J, 2022, IoT-Based Equipment Monitoring for Construction Technology Optimization. Engineering, Construction and Architectural Management, 29(7): 2789–2805.
Zhao M, Liu Y, Zhang K, 2020, Predictive Analytics in Technical Risk Management of Power Plant Construction. Advanced Engineering Informatics, 2020(46): 101176.
Sun W, Chen G, Lee H, 2021, Lifecycle Impact Assessment of Collaborative Construction Approaches. Sustainable Cities and Society, 2021(75): 103318.
Smith J, Brown K, Taylor R, 2022, Multi-Stakeholder Coordination Mechanisms in Environmental Infrastructure Projects. International Journal of Project Management, 40(3): 245–259.
Xu Z, Wang Q, Li J, 2023, BIM Applications in Plant Layout Optimization: Emerging Trends and Case Studies. Energy and Buildings, 2023(278): 112653.
Huang L, Zheng Y, Zhou X, 2021, Digital Twins for Emission Control System Commissioning in Thermal Plants. Building and Environment, 2021(204): 108167.
Wang T, Chen S, Liu C, 2023, Synergy Efficiency Indicators for Construction Management-Technology Integration. Journal of Construction Engineering and Management, 149(2): 04022156.
Kim S, Park J, Lee S, 2020, Laser Alignment Technologies in Turbine-Generator Installation Management. Measurement, 2020(163): 107956.
Liu B, Zhang H, Wang X, 2022, Adaptive Workflow Models for Boiler System Construction Scheduling. Automation in Construction, 2022(137): 104198.
Yang R, Li M, Wu Q, 2021, Environmental Compliance Management in SCR System Installation Projects. Journal of Environmental Management, 2021(299): 11361.