Research on Collaborative Mechanisms and Platform Optimization for Engineering Procurement Management in Multi-Campus Universities
Download PDF

Keywords

Multi-campus
Engineering field
Bidding and procurement
Prevention and control system

DOI

10.26689/jwa.v9i6.13263

Submitted : 2025-12-10
Accepted : 2025-12-25
Published : 2026-01-09

Abstract

With the continuous deepening of China’s higher education system reform, universities have adopted a multi-campus model through mergers, reconstructions, and expansions, alleviating the constraints on their development and leading to a significant rise in infrastructure construction project procurement. Consequently, internal control and risk management in the procurement process under the multi-campus management model have garnered widespread attention. The bidding and procurement in the engineering field now face new risks and challenges. By analyzing factors such as the division of procurement management responsibilities and the connection of procedures across campuses, the complexity and variability of construction project procurement, and the characteristics of university construction project procurement, this paper proposes a risk prevention and control system for multi-campus engineering bidding and procurement under the principles of “centralized leadership, tiered management, and professional collaboration.

References

Liu H, Liu Z, Li R, et al., 2004, Research on the Status of Multi-Campus Education in Chinese Universities. Petroleum Education, 2004(1): 4.

Liu X, 2025, Risk Assessment and Empirical Study on Procurement of High School Construction Projects, thesis, Xi’an University of Technology.

Xu K, Wang Y, Teng Y, 2025, Exploration of Procurement Management in Multi-Campus Universities. Experimental Technology and Management, 42(3): 261–265.

Li D, Yang Y, Jia Y, et al., Construction of Information System for Sunshine Procurement in Universities. Experimental Technology and Management, 36(10): 7.