Analysis of Reinforcement Techniques for Newly Built Tunnel Defects
Download PDF
$currentUrl="http://$_SERVER[HTTP_HOST]$_SERVER[REQUEST_URI]"

Keywords

Newly built tunnels
Defect treatment and reinforcement
Initial support deformation
Lining cracking

DOI

10.26689/jard.v9i1.9494

Submitted : 2025-01-15
Accepted : 2025-01-30
Published : 2025-02-14

Abstract

Newly built tunnels often encounter a series of defects within the first few years of operation. If not promptly addressed and reinforced, these defects threaten the tunnel’s durability and stability and bring severe challenges to its safe operation. This study aims to explore reinforcement techniques for addressing defects in newly built tunnels. The research begins with an analysis of common defects found in newly built tunnels, followed by a case study of the Jinfeng Tunnel in Chongqing, examining the post-construction defects. The actual reinforcement strategies and methods employed for the tunnel are then discussed. Finally, based on the research findings, this study provides insights and references for tunnel operation and construction units in China, aiming to enhance the overall quality of tunnel engineering in the country, align with sustainable development goals, and promote further improvements at a macro level.

References

Liu F, 2023, Finite Element Analysis of Highway Tunnel Disease Treatment and Steel Strip Reinforcement Technology. Engineering Construction and Design, 2023(1): 96–98.

Yuan H, 2022, Study on the Mechanism of Water Leakage Disease in Tunnel Secondary Lining and Reinforcement Treatment Technology. Heilongjiang Transportation Science and Technology, 45(8): 118–121.

Xiao C, Jia Y, Li K, et al., 2022, Research on Comprehensive Treatment Technology for Leakage Diseases in Active Tunnels—Taking Corrugated Steel Lining Reinforcement as an Example. Sichuan Building Materials, 48(9): 154–156.

Wang Y, 2024, Design of Disease Treatment for the Civil Engineering Structure of Huilongwan Tunnel. Science and Technology Information, 22(16): 235–238, 243.

Zhang C, Wu H, 2024, Analysis and Treatment Scheme of Highway Tunnel Lining Diseases. Anhui Architecture, 31(2): 150–153.

Cao Y, 2024, Analysis of Highway Tunnel Disease Detection and Treatment Technology. Sichuan Building Materials, 50(7): 172–174.

Deng J, Chen R, Yan D, 2024, Reinforcement Technology for Cracking of Side and Upslope at the Entrance Section of Shallow-buried and Unbalanced Tunnel. Western China Communication Science and Technology, 2024(5): 101–102.

Yang Z, Xu Y, Wang X, et al., 2024, Discussion on the Treatment Construction of Cracking Diseases in the Middle Wall of Thin-walled Arch Tunnels. China Highway, 657(5): 118–120.

Liu P, 2023, Research on New Temporary Support Technology for the Treatment of Inverted Arch Diseases in Tunnel Construction in Complex Geological Environments. Shandong Transportation Science and Technology, 2023(4): 100–104.

Zhang L, Weng X, Xiong X, et al., 2022, Evaluation Analysis and Treatment Technology of Secondary Lining Diseases in Tunnel Entrance Section. Journal of Shandong Jiaotong University, 30(2): 72–80.