The pollution problem arising from the flushing of initial rainwater and wastewater from accidents while transporting dangerous goods to source water protection areas needs to be solved as soon as possible. Therefore, the design of corresponding environmental protection measures should be considered in the engineering design stage. It is necessary to analyze the specific work in combination with engineering examples. Under this background, this paper first briefly expounds the precautions in accident risk analysis and the design of tank capacity and tank body. Finally, by analyzing actual cases, this paper systematically studies the design strategy of emergency pool in source water protection area, hoping to provide new development ideas for the upgrading of relevant work.
Xu L, 2021, Example of Sewage Treatment Plant Design in an Industrial Park in Xinjiang. Construction & Design for Project, 2021(09): 90-92.
Sun X, 2019, Design of Runoff Collection and Emergency Response System for Bridge Deck. Urban Roads Bridges and Flood Control, 2019(07): 161-163, 21.
Li Z, 2019, Discussion on Design of Accident Sedimentation Tank in Water Source Protection Area. Urban Roads Bridges and Flood Control, 2019(06): 178-179, 20-21.
Wang D, 2017, Design of Tianjin Port Sewage Treatment Plant Upgrade and Reconstruction Project. Petrochemical Industry Technology, 24(11): 19-21.
Wang Q, He X, Su H, et al., 2016, Discussion on Design of Emergency Sedimentation Tank for Highway Bridge Head in Water Source Protection Area. China Water & Wastewater, 32(16): 73-76.