Abstract

To effectively address the challenge where the speed of tunnel lining construction struggles to match that of tunnel face and inverted arch construction, and to enhance the quality of secondary lining, a new type of skeleton-free, traversing secondary lining trolley has been developed. This trolley features a set of gantries paired with two sets of formwork. The formwork adopts a multi-segment hinged and strengthened design, ensuring its own strength can meet the requirements of secondary lining concrete pouring without relying on the support of the gantries. When retracted, the formwork can be transported by the gantries through another set of formwork in the supporting state, enabling early formwork support, effectively accelerating the construction progress of the tunnel’s secondary lining, and extending the maintenance time of the secondary lining with the formwork. Finite element software modeling was used for simulation calculations, and the results indicate that the structural strength, stiffness, and other performance parameters of the new secondary lining trolley meet the design requirements, verifying the rationality of the design.

References

Huang G, 2015, Research on the Application of Arch Wall Separated Trolley in the Second Lining Construction of Large Section Tunnels in Metro Intervals. Railway Construction Technology, 2015(6): 36–39+62.

Yan X, Wu X, Peng W, et al., 2014, Construction Technology of Full-Section Secondary Lining Steel Formwork Trolley for Tunnels. Construction Technology, 2014(13): 114–117.

Luo D, Gao B, Sun T, 2008, Application of Integral Lining Trolley in Railway Passenger Dedicated Line Tunnels. Modern Tunnelling Technology, 2008(06): 88–91.

Lou C, 2022, Research and Application of Construction Technology for Integrated Pipe Corridor Traversing Steel Formwork Trolley. China High-Tech Industries, 2022(24): 34–36+51.

Zhang J, Han G, 2007, Application of Full-Section Lining Trolley in Water Conveyance Tunnel Construction. Construction Technology, 2007(S1): 191–194.

Chen J, Zhao P, Luo Y, et al., 2023, Field Test on Heat Transfer Characteristics and Temperature Field Evolution Law of Tunnels in Cold Regions. China Journal of Highway and Transport, 2023(8): 190–203.

Xu P, Wu Y, Yan X, et al., 2022, Analysis of Temperature Field and Effectiveness of Insulation Layer in High-Speed Railway Tunnels in Severe Cold Regions. China Railway Science, 2022(04): 64–73.

Lin Q, 2020, Design Concept and Application of Triangular Articulated Tunnel Lining Trolley. Railway Construction Technology, 2020(08): 64–66+75.

Sheng J, 2008, Development of a New Fully Hydraulic Self-Propelled Tunnel Lining Trolley. Journal of Shijiazhuang Tiedao University (Natural Science Edition), 2008(03): 86–89.

Zhang G, Tang B, Chen Z, et al., 2024, Research on Key Technologies of New Digital-Intelligent Integrated Tunnel Lining Trolley. China Water Transport (Second Half Month), 2024(1): 131–133.

Li L, Wang P, Yang J, 2022, Design and Optimization Analysis of Large-Span Variable Cross-Section Tunnel Lining Trolley. Railway Construction Technology, 2022(02): 48–52.

Liu S, Zhang H, Zhu F, et al., 2021, Load Calculation and Numerical Simulation of Secondary Lining Trolley. Journal of Hunan University of Technology, 2021(02): 7–14.

Liu X, Huang G, Cheng C, 2019, Optimization Analysis of Tunnel Lining Trolley Formwork Structure. Construction Machinery, 2019(10): 37–39+4.