Discussion on Construction and Erection Technology of Bridge Precast Box Girder
Download PDF

Keywords

Bridge construction
Precast box girder construction
Erection technology

DOI

10.26689/jard.v6i3.3887

Submitted : 2022-05-01
Accepted : 2022-05-16
Published : 2022-05-31

Abstract

At present, the precast construction technology has been widely used, especially in the process of bridge construction, where the precast box girder construction and erection technology has attracted more attention compared to other available methods. In order to effectively improve the application effect of this technology, and the overall quality of the bridge, this paper discusses the advantage and disadvantage of implementing the precast box girder construction and erection technology in the bridge construction.

References

Hu L, 2020, Research on Construction Technology of Prefabricated Beam Erection in Bridge Engineering. Transpoworld, 2020(22): 119-120,130.

Ma N, 2020, Construction Technology and Quality Control of Prefabricated Box Girder for Bridge. New Technology and New Products of China, 2020(20): 100-101.

Wang J, 2020, Construction Technology of Prefabricated Beam Structure after Bridge Construction. Communications Science and Technology Heilongjiang, 43(1): 119-120.

Liang F, 2021, Application of Precast Beam Construction Technology in Highway Bridge Engineering. Modern Property: Journal of the Mid-Month, 2021(4): 152-153.