Long-Distance Pipe Jacking in Complex Urban Geological Environment
Download PDF

Keywords

Long-distance pipe jacking
Complex geology
Urban area
New technology

DOI

10.26689/jard.v6i1.2888

Submitted : 2021-12-13
Accepted : 2021-12-28
Published : 2022-01-12

Abstract

A steel underground pipeline with a diameter of 2.4 m and a total length of 3,617 m (plate thickness of 26 mm) has been constructed in a city in central Hubei, and the engineering, procurement, and construction (EPC) project has been lifted from the upstream channel to supplement water to the downstream lake inside the city. Through preliminary geological survey data, site topographic and geomorphic survey, urban construction, as well as the requirements of the construction party, the preliminary arrangement of working wells and receiving wells as well as the selection and customization of pipe jacking machines have been proposed. Frequency conversion motor and remote monitoring technology are adopted for geotechnical change and long-distance pipe jacking. Through detailed survey, the rock and soil change section as well as gradual change conditions have been determined, the accuracy of construction mechanics calculation and construction operation control have improved, the basis and analysis basis are provided, and some experiences in construction operation are summarized.

References

Cui H, 2021, Comprehensive Research on Long Pipe Diameter Distance Pipe Jacking Engineering under Complex Geological Conditions. China Metal Bulletin, 2021(12): 2.

Zhang J, 2020, Research on Jacking Force Control of Long Distance and Large Diameter Pipe Jacking Tunnel under Complex Geological Conditions. China Construction, 2020(14): 3.

Wang Q, Wang Y, 2020, Discussion and Practice of Pipe Jacking Technology in Long Distance and Large Diameter Complex Geology in Mountainous Area. Shanxi Architecture, 46(2): 2.

Cheng Q, 2020, Study on Construction Efficiency and Influencing Factors of Pipe Jacking under Complex Geological Conditions. Intelligent City, 6(3): 2.

Sun X, 2020, Study on Construction Efficiency and Influencing Factors of Pipe Jacking under Complex Geological Conditions. DOI: 10.12159/j.issn.2095-6630.2020.11.1570

Guo J, Zhu T, 2021, Application of Open-Cut Pipe Jacking in Pipeline Construction of Complex Geological Section. Science & Technology Information, 2021(2020-30): 65-67.

Song H, Jia X, Zhang P, et al., 2020, Discussion on Pipe Jacking Technology under Complicated Geological Condition of Large Diameter Pebble. Modern Property Management, 2020(7): 2.

He X, 2020, Construction and Settlement Control of Municipal Road Sewage Pipe Jacking under Complex Geological Conditions. DOI: 10.12159/j.issn.2095-6630.2020.16.2722

Hu F, 2020, Research and Application of Long-distance Pipe Jacking Technology in Municipal Water Supply and Drainage Construction. Zhejiang University of Technology.

Jin D, Chen Y, 2020, Discussion on Pipe Jacking Construction of Municipal Sewage Pipeline Engineering. Ecological Environment and Protection, 3(7): 61-62.

Li Y, Cheng H, Cao G, et al., 2020, Application of Non-blasting Rock Excavation Technology in Hard Rock Stratum During Pipe Jacking. Water Resources and Hydropower Engineering, 51(6): 9.

Gu M, Yao X, Huang S, 2020, Construction Method of Finished Sewage Pipe Network under Complex Geological Conditions. SooPAT, 2020: CN110700378A.