Through an example of a main transformer switch-in with load during the reverse transmission of a 750 kV power plan, the paper introduces the basic principle of transformer switch-in with load. EMTPE program that is used to establish a calculation model, at the same time mainly considers the excitation characteristics of the transformer, the transient model of the circuit breaker, and the model of high voltage transformer, and calculated the inrush current with transformer switch-in with load in this plan. During system debugging in the plan, the two sets of main transformers passed the closing and opening test, and the data of inrush current in the test are recorded and analyzed. The simulation calculation and measured data show that the results are consistent. The simulation calculation also shows that it is not recommended to perform on-load closing of the transformer except for special circumstances, because of the influence of hysteresis characteristic when the transformer was switched in with load or the terminal voltage of the transformer resumed normal level from a low one after an external near-end fault was cleared, which various transformer differential protection using the characteristics of inrush to implement block scheme may mal-operate.

References

Lin CE, 1993, Investigation of Magnetizing Inrush Current in Transformers, Part-Numerical Simulation. IEEE Trans. on PW RD, 8(1): 623–629.

Cui Y, Adulsalam SG, Chen S, et al., 2005, A Sequential Phase Energization Technique for Transformer Inrush Current Reduction—Part I: Simulation and Experiment Results. IEEE Transaction on Power Delivery, 20(2): 943–949.

Shyu JL, 2005, A Novel Control Strategy to Reduce Transformer Inrush Current by Series Compensator. International Conference on Power Electronics and Drives Systems, Kuala Lumpur, Malaysia, 2: 1283–1288.

Shimizu H, Mutsuura K, Yokomizu Y, et al., 2005, Inrush-Current-Limiting with High Tc Superconductor. IEEE Transactions on Applied Superconductivity, 15(2): 2071–2073.

Yoshida A, 1979, Transformer Protection Relaying Equipment. HITACHI Comments, 61(11): 1276–1281.

Himata Y, Nakajima T, Koshizuka T, et al., 2020, Residual Magnetic Flux of On‐Load Transformer for Controlled Switching. IEEJ Transactions on Electrical and Electronic Engineering, 15(8): 1134–1138.

Yuan Y, Lu Y, Xu Y, et al., 2005, The Influence and Countermeasure to Transformer Differential Protection of CT Partial Transient Saturation caused by External Fault Removal. Proceedings of the CSEE, 25(10): 12–17.

Li J, 2013, Analysis on Mal-Operation of Differential Protection of High-Voltage Auxiliary Transformer During On-Load Switch-In. Zhenjiang Electric Power, 7(3): 18–21.

Lin XN, Liu P, Liu SM, et al., 2002, Ultra-Saturation State during Transformer Switch-In with Load and its Influence to Transformer Differential Protection. Proceedings of the CSEE, 22(3): 6–11.

Weng HL, Lin XN, Liu PC, 2006, A Novel Explanation to the Mal-Operation of Differential Protection During the Loaded Transformer Energization. Proceedings of the CSEE, 26(20): 28–32.

Hu T, You DH, Jin ML, 2006, Non-Linear Mathematic Model and Simulation of Transformer Energization with Load. Electric Power, 39(11): 51–54.

Chen Z, Lin J, 2009, The Instructions of EMTPE. China Electric Power Research Institute, 2009: 46–51.

Canadian/American EMTP User Group, 1995, Alternative Transients Program (ATP) Rule Book. Canadian/American EMTP User Group, Oregon.

Dommel HW, 1991, Theory of Electromagnetic Transient Computation for Power System. Water Resources and Electric Power Press, Beijing.

IEEE Standard for AC High-Voltage Generator Circuit Breakers Rated on a Symmetrical Current Basis in IEEE Std C37.013-1997, 1997: 1–96. https://doi.org/10.1109/IEEESTD.1997.85255

Kong J, He B, Ning J, et al., 2018, Simulation Analysis of the Influence of Circuit Breaker Transient Model and Parameters on VFTO. Electrical Measurement and Instrumentation, 55(12): 32–38.

Fu Y, Lan Z, Chen Y, 1997, Simulation of Magnetizing Inrush Current in Three-Phase Transformer Considering Dynamic Magnetization Performance of Core. Transformer, 34(9): 4–10.